YPT Commissioning & Start Up



  • Experience That Starts the Plant — and Keeps It Running

  • From Blueprint to Production — Turning Engineering into Operation



YPT means, field-proven start-ups across commodities and geographies, full EPC continuity, rigorous HSE/QMS adherence, operator empowerment through training, and ongoing optimization programs to keep improving long after handover.

Fatih Bitnel
YPT General Manager


From Blueprint to Production — Turning Engineering into Operation


YPT Commissioning & Start Up



The decisive transition from construction to sustained performance. With 30+ years of global start-ups, YPT validates each circuit, trains operators, optimizes systems, and hands over a fully documented, performance-guaranteed facility.


Complex Design

Material Integrity

Heavy performance

Speed, flexibility

Before We Start, We Verify Everything


Pre-Commissioning and System Readiness

Mechanical completion verification and punch-list closure; cleaning & inspection; dry rotation tests; electrical continuity/insulation tests; instrument calibration & loop checks; control system validation of alarms/interlocks/sequences — all under QMS protocols and ISO/IEC safety.

Step by Step — Turning Systems Alive


TOP QUALITY

FOR ALL OUR PRODUCTS

GUARANTEED

The YPT Document Management System (DMS) keeps all certification files traceable and audit-ready.


Cold and Hot Commissioning

Cold runs validate logic without feed; hot runs introduce ore/process fluids to stabilize performance. Activities include energization, sequential start-up, first fills/circulation, live instrument calibration, DCS/PLC tuning, and throughput ramp-up to design capacity.

Knowledge Transfers. Performance Stays


Operating and Maintenance Trainings

Classroom modules (process theory, flowsheet logic, safety), hands-on field training on YPT equipment and controls, preventive maintenance programs, operator certification, and QMS-issued operation manuals tailored to the plant.

Performance Doesn’t End at Start-Up — It Begins There


Plant Optimizations and Audits

Post-stabilization audits compare actual KPIs to design; energy/water analyses; reagent optimization; bottleneck analysis & debottlenecking actions; control-system tuning. Results flow into YPT’s Life-Cycle Service Database for continuous improvement.

Validated, Certified, Guaranteed...


Handover and Performance Guarantee

Performance Guarantee Test Report (PGTR); QMS-verified as-built documentation; O&M manuals and spare-parts catalogues; final punch-list clearance and formal handover. A fully documented plant ready for continuous operation — with YPT standing behind its performance.l.



Key Deliverables


  • Pre-Commissioning & Mechanical Completion Reports

  • Cold & Hot Commissioning Protocols

  • Performance Guarantee Test Reports (PGTR)

  • Operating & Maintenance Training Manuals

  • Process Optimization & Audit Reports

  • O&M Manuals and Spare-Parts Catalogues

  • As-Built & Handover Documentation

  • Commissioning Dossier (QMS-approved)

TOP QUALITY

FOR ALL OUR PRODUCTS

GUARANTEED

The YPT Document Management System (DMS) keeps all certification files traceable and audit-ready.

Commissioning — Closing the EPC Loop — From Design to Operation

Procurement:

commissioning verifies vendor compliance; manuals, certificates, warranties integrated into the final dossier.

Construction:

joint work during mechanical completion resolves site modifications; as-built updates captured.

Quality:

all test protocols, training records, and reports are controlled and archived under the QMS.