RIL/RIP Gold Processing Project–AIMC

PROJECT DETAILS


Project Name:

AIMC Gedabey Gold Mine

Client:

AZERBAIJAN International Mining Company

Location:

Azerbaijan – Gedabey

Mineral:

Gold

Enrichment Method:

RIL- RIP

Capacity:

105 tph

Start Up:

2015


PROJECT DESCRIPTION


Project involved enhancing the existing RIL/RIP Gold Processing Plant by incorporating a copper flotation circuit to improve recovery rates on sulfide ore before CN leaching.


SCOPE OF SERVICE


Basic and detailed engineering studies for the Flotation plant Equipment Supply (Conditioners, Flotation Cells, Reagent Prep. Dosing system, complete Slurry - Froth Pumps, Product and Tailing Thickener) Construction of the project on-site Commissioning and start-up